Moving forward

Each day finds us getting closer to opening the doors for the public to see what was hidden behind by time. The layers of dirt, grime, and mold will soon only be memories. After 5+weeks of continuous work, the cracked and water damaged walls have been repaired. A 140+ gallons of paint on the ceiling, walls, and trim have given the interior a new lease on life to this 90+ year old gem.

Advertisement

Inside progress

70 gallons of paint on the ceiling

Confessionals are getting some attention.

If you look at the bottom of the front wall, you can see some of the various colors that the walls were painted in the past 90 years.

The upper ceiling has been repaired, primed and 2 coats of paint applied. The walls are getting 2 coats of paint.

The lower ceiling is next.

Balcony is done.

Upper windows are getting a face lift.

Lower walls are next