Inside progress

70 gallons of paint on the ceiling

Confessionals are getting some attention.

If you look at the bottom of the front wall, you can see some of the various colors that the walls were painted in the past 90 years.

The upper ceiling has been repaired, primed and 2 coats of paint applied. The walls are getting 2 coats of paint.

The lower ceiling is next.

Balcony is done.

Upper windows are getting a face lift.

Lower walls are next