June Open House

Advertisement

Sun Setting

Another busy day….

Plumber and electrician spent the day working on bathroom…

Front stairs are being built…

Work begun on kitchenette…cabinets are being installed….

Crushed rock piles were moved…

Pews have been brought in….

Grass seed is waiting for Mother Nature to water.

The Clock is Ticking!

Goals for this week

  1. Finish green siding
  2. Install back window
  3. Install exterior lights
  4. Install yellow scallop siding on dormer
  5. Put side door back
  6. Spread remaining loam and seed
  7. Edge drip edge with crush rock
  8. Bathroom and kitchenette plumbing
  9. Trim needs to be finished
  10. Install remaining Stain glass inserts
  11. Rehang Stations of the Cross
  12. Front stairs being replaced
  13. Interior ramp installed
  14. Platform corner pieces reconfigured and installed
  15. Pews brought back in
  16. ???????

Stain Glass Inserts

We started putting the lower stain glass inserts back in place.

The main part of St Bridget Center is nearing completion.

The 1st event is just a week and a half away.

The back shingles have been removed, insulated wrap installed, window will be replaced and siding put on this coming week.

The glass from the back window was used to replace broken glass in main portion of center.

Bathroom wall is up, wiring done plumbing has begun…in a few days there will be a working bathroom.

Landscaping

Ramp edged with crushed rock, 4 yds of loam spread, perennials planted, pear trees relocated, bare spots reseeded..3 days work …

This week’s goals replace broken windows on driveway side, continue working on siding, continue inside trim, work on bathroom, install kitchen cabinets, continue work on plumbing, reinstall stain glass inserts, begin moving tables, folding chairs, back into church…

Ready for siding

Water, Rot, Safety, and

Weatherization Issues resolved in this section

  1. Driveway and 12-13 inches of gravel and another driveway removed- windows no longer 1/2 way covered with dirt
  2. Removed ramp that did not meet code
  3. Replaced basement windows
  4. Repaired bricks
  5. Rotted dormer windows removed
  6. Removed exterior basement stairs
  7. Rotted window by door removed
  8. Insulated dormer
  9. Removed shingles
  10. Insulated voids between basement ceiling and main floor
  11. Turned steps to make them safer
  12. Wrapped side with insulated foil
  13. Saved 2 good windows and removed broken window
  14. Exterior Light needed to be moved and replaced
  15. New roof

What is left!

  1. New landing for stairs and back rail
  2. Door needs adjusting
  3. Broken window sections needs to be replaced
  4. Siding
  5. Install light
  6. Landscaping
  7. Driveway – next year